Marriott Hotel – Elevator Bank Refresh with 3M™ DI-NOC™
client
Marriot Hotel - Plainview NY, USA
Location
Plainview, NY USA
Date
Service
Project Snapshot
Client: Marriott Hotel (New York)
Sector: Hospitality
Location: New York, NY
Scope: Elevator bank doors (exterior) and elevator cab interiors
Services: Surface removal & prep, substrate repair, 3M™ DI-NOC™ application
Duration: All elevators completed within 10 days
Operational impact: No guest-facing downtime or service interruptions
Overview
The hotel’s elevator cabs and doors were structurally sound but looked tired and dated. Years of:
Layered, mismatched paint on the exterior metal doors and frames
Cracked, aged laminate panels inside the cabs
Dents, dings, and surface imperfections had left the elevators feeling far below the standard Marriott wanted to present to guests.
Management wanted a high-end, refreshed look that matched the overall standard of the property—but without:
Removing and replacing entire elevator interiors
Creating construction noise and visible disruption
Taking elevators out of service for extended periods
AFF was brought in to re-skin and revive the elevators using 3M™ DI-NOC™ architectural finishes.
The Challenge
Heavily worn substrates. Years of layered paint on the metal doors and jambs, plus cracked and failing laminate inside the cabs, meant surfaces were far from smooth or “wrap ready.”
Visible dents and dings. Physical damage to the metal and panels made the interiors feel neglected and low-end.
No downtime. Elevators needed to remain available for guests, with minimal perceived disruption in a busy hotel environment.
Premium brand expectations. Marriott required a finish level that matched a four-star hospitality experience, not just a quick cosmetic patch.
The core challenge:
Deliver a “new elevator” look on existing structures, quietly, in a live hotel.
Our Approach & Solution
AFF designed a process that combined deep surface preparation with high-end film finishes, executed in a tightly managed schedule.
Careful removal of old finishes
Stripped back multiple layers of old, uneven paint on the metal elevator doors and jambs.
Removed cracked and failing laminate panels from the cab interiors.
Ensured all loose, unstable material was taken off to create a solid base.
Substrate repair & stabilization
Addressed dents, dings, and surface imperfections using appropriate fillers and bonding methods.
Sanded and smoothed repaired areas to create a consistent substrate suitable for film application.
Focused on corners, edges, and high-touch areas where defects are most visible.
Application of 3M™ DI-NOC™ dark fine wood grain
Wrapped interior cab panels in a dark wood-grain DI-NOC™ pattern to deliver a warm, high-end hospitality feel.
Applied matching DI-NOC™ to exterior elevator jambs and select metal surfaces for a cohesive look from lobby to cab.
Aligned grain direction and seams for a furniture-grade appearance rather than a “sticker” look.
Phased work schedule with no downtime
Planned work in short, controlled windows to ensure elevator availability throughout the day.
Coordinated closely with hotel operations to avoid peak guest traffic times.
Completed the full bank of elevators—inside and outside—within 10 days, with no guest-facing shutdowns.
Materials & Methods
3M™ DI-NOC™ Architectural Finishes
Dark fine wood-grain pattern selected to complement the hotel’s existing lobby finishes and elevate perceived quality.
Used on:
Interior cab wall panels
Elevator door jambs and surrounding metal surfaces (where appropriate)
Surface Prep & Repair
Mechanical removal of layered paint on metal doors and frames
Removal of aged laminate from cab interior panels
Use of permanent bonding and repair compounds to fill dents and dings
Sanding and smoothing for a flat, uniform substrate
Installation Practices
Careful edge wrapping and seam placement for durability and aesthetics
Heat forming around reveals and profiles where necessary
Clean-up and protection protocols to maintain a tidy work area in guest corridors
Results & Impact
Elevators that match the brand. The newly wrapped elevator cabs and doors now convey the level of class and refinement guests expect from a Marriott property.
“New” look without replacement. By restoring and wrapping existing surfaces, the hotel avoided the cost and disruption of full elevator cab replacement.
No guest downtime. All work was completed over approximately 10 days without taking elevators out of service, preserving guest convenience and hotel operations.
Durable, easy-to-maintain finishes. 3M™ DI-NOC™ provides a cleanable, repairable surface designed to stand up to heavy hotel traffic and cleaning routines.
High satisfaction from management and guests. The transformation from dented, dated surfaces to sleek dark wood grain delivered an immediate uplift in perceived quality.
Scope of Work
Site review and condition assessment of elevator bank
Removal of old layered paint and failing laminate panels
Repair and smoothing of dented and damaged substrates
Selection and installation of 3M™ DI-NOC™ dark fine wood-grain finish
Wrapping of interior cab panels and exterior jambs
Phased on-site work coordinated with hotel operations
Full bank of elevators completed in 10 days with no downtime